Our latest wastewater treatment plant at Székkutas was inaugurated on April 13, 2016. Utilizing our CYCLATOR™ technology – the plant can treat 220 m3 raw wastewater including 6 m3 septic waste daily. The 1.5 Mrd HUF (5 m€) collection system (11,4 km) and treatment plant project was 100% supported by EU and Hungarian government funds.
The CYCLATOR™ technology is a fully automatic, simple to operate, advanced biological treatment system that responds to flow and load variations, is easily expandable and produces a high quality effluent. This unique wastewater treatment plant applies combined mechanical pretreatment, a double line 600 m3 volume biological treatment stage, and a sludge dewatering line.